INTEGRATED OUTDOOR HIGH-VOLTAGE BATTERY CABINET
HV51.2V200Ah Outdoor High-Voltage Battery Cabinet
MODEL · HV51.2V200Ah
HV51.2V200Ah integrates six to eleven 51.2V 200Ah LiFePO4 modules inside an IP54 cabinet. The catalog covers 307.2-563.2V nominal voltage, 61.44-112.64kWh nominal energy and 50A recommended, 100A maximum current. Air-conditioning thermal management and a -20-60C working range distinguish it from the indoor ET rack systems. PCS, protection, fire-safety scope and site foundation remain project-specific.
For EPC contractors and commercial project buyers needing a protected cabinet format for outdoor solar storage, backup or distributed energy sites.
Technical values are based on the supplied LeforESS catalog and remain subject to the selected model datasheet.
Outdoor Commercial Battery Enclosure
61.44-112.64kWh in an IP54 Integrated Cabinet
This model packages the battery modules and thermal enclosure as one cabinet platform. It reduces indoor-room dependence but does not remove the need for site engineering, PCS matching and local safety compliance.
Commercial solar energy shifting
Locate storage near the electrical point of connection where the site plan, temperature exposure and maintenance access support the cabinet.
Distributed facility backup
Configure the six-to-eleven-module bank around verified critical loads, transfer strategy and compatible power-conversion equipment.
Remote energy sites
Use the conditioned cabinet where outdoor equipment is needed, while confirming altitude, humidity, dust, drainage and communications for the actual location.
Verified Product Data
HV51.2V200Ah Cabinet Specifications
These values describe the battery cabinet in the supplied catalog. They are not specifications for the separate 215.04kWh container product already listed on the website.
| Module | Cell chemistry | LiFePO4 |
|---|---|---|
| Module energy | 10.2kWh | |
| Nominal voltage | 51.2V | |
| Capacity | 200Ah | |
| Module dimensions (W x D x H) | 396 x 575 x 248mm | |
| Approximate module weight | 77kg | |
| System | Modules in series | 6-11 optional |
| Nominal voltage | 307.2-563.2V | |
| Operating voltage | 278.4-633.6V | |
| Nominal energy | 61.44-112.64kWh | |
| Usable energy listed | 55.3-101.38kWh | |
| Charge/discharge current | Recommended 50A; maximum 100A | |
| Cabinet | Cooling | Air conditioner |
| Enclosure rating | IP54 | |
| Dimensions (W x D x H) | 1394 x 1015 x 2164.5mm | |
| Approximate weight | 965-1350kg | |
| Installation | Integrated cabinet installation | |
| Environment | Working temperature | -20-60C |
| Humidity | 5%-85% RH | |
| Altitude | <2000m | |
| Storage temperature | 0-35C | |
| Integration | Communication | CAN, RS485 |
| Recommended depth of discharge | 90% | |
| Cycle life listed | >=6000 cycles | |
| Warranty listed | 5 years | |
| Certification listed | CE, MSDS, UN38.3 |
Product specifications and configuration options must be confirmed against the selected model datasheet before ordering. The brochure mentions fire protection but does not define detection, suppression agent, interfaces or compliance standard. Keep the fire-safety scope conditional until a cabinet drawing and safety document are approved.
Outdoor Site Integration
Cabinet Thermal Control and Site Interfaces
The air-conditioned IP54 enclosure supports outdoor deployment, but environmental protection depends on installation details such as cable entry, drainage, spacing and routine service access.
Technical Buying Questions
Outdoor HV Cabinet Project Questions
Does the cabinet include a PCS or hybrid inverter?
The supplied specification table defines the battery cabinet and communication interfaces. Any PCS or inverter shown nearby must be quoted and verified separately unless the commercial offer explicitly includes it.
Can the cabinet be placed in any outdoor location?
No. IP54 is only one design input. Flood risk, drainage, solar loading, ambient temperature, corrosion, clearances and local codes still require review.
Is fire suppression included?
The brochure references fire protection but does not provide a system specification. Request the current safety drawing, component list and applicable compliance documents.
How is the final cabinet energy selected?
Choose six to eleven modules based on PCS voltage, required usable energy, current, transport weight and the approved cabinet configuration.
